LOGISTICS SERVICES
The logistics center acts as a bridge between the road and the railway. Raykent unloads and loads the freight wagons coming from the manufacturing factories in these facilities. The hangar and rail shelf in the logistics center allow many wagons to dock at the same time. With the help of the cranes in the facility, the wagons are transferred to the trucks or trailers and the logistics cycle is provided. In addition, it is possible to stock a certain capacity in the existing facility. Thus, the process is continued by stocking in railway delays or road delays.
Raykent's Polatlı District Beylikköprü village station is located on the west side of the area, which has 25 decares of land and two junction lines, 250 + 270 meters long, within this land.
There is a 500m² closed steel construction building and a 10-ton overhead crane working inside the building on the existing junction line and on the site. There are concrete hoses at the end of the junction lines. One of these hoses is designed as a ramp so that a vehicle can be unloaded from the wagon.
There is a suitable area and opportunity for handling in the field.